分类: 核科学技术 >> 核探测技术与核电子学 分类: 核科学技术 >> 核仪器、仪表 提交时间: 2024-02-07
摘要: A new measurement method for the spatial distribution of neutron beam flux in boron neutron capture therapy (BNCT) is being developed based on the two-dimensional Micromegas detector. To address the issue of long processing time in traditional offline position reconstruction methods, this paper proposes an FPGA-based online position reconstruction method, grounded in the micro time projection chamber principle. This method encapsulates key technical aspects: self-adaptive serial link technique built upon the dynamical adjustment of delay chain length, fast sorting and coordinate matching technique based on the mapping between signal timestamps and random access memory (RAM) addresses, and precise start point merging technique utilizing a circular combined RAM. The performance test of the self-adaptive serial link shows the bit error rate of the link is better than 10^-12 at a confidence level of 99%, ensuring reliable data transmission. The combined experiment of the readout electronics and the Micromegas detector shows a spatial resolution of approximately 1.4 mm, surpassing the current method's resolution level of 5 mm. The beam experiment confirms that the readout electronics system can obtain the flux spatial distribution of neutron beam online, thus validating the feasibility of the position reconstruction method. The online position reconstruction method avoids traditional methods such as bubble sorting and traversal searching, simplifying the design of logic firmware and reducing the time complexity from O(n^2) to O(n). This study contributes to the advancement in measuring neutron beam flux for BNCT.
分类: 物理学 >> 核物理学 提交时间: 2016-09-01
摘要: The Beijing Spectrometer III (BESIII) endcap Time-Of-Filght (ETOF) was proposed to upgrade with Multigap Resistive Plate Chamber (MRPC) technology to substitute the current ETOF of scintillator+PMT for extending time resolutin better than 80 ps and enhance the particle identification capability to satisfy the higher precision requirement of physics. The ETOF system including MRPC modules, front end electronics (FEE), CLOCK module, fast control boards and time to digital modules (TDIG), has been designed, constructed and done some experimental tests seperately. Aiming at examining the quality of entire ETOF system and training the operation of all participated parts, a cosmic ray test system was built at the laboratory and underwent about three months to guarantee performance. In this paper the results will be presented indicating that the entire ETOF system works well and satisfies the requirements of the upgrade.
分类: 物理学 >> 核物理学 提交时间: 2016-09-05
摘要: The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.