您当前的位置: > 详细浏览

Milestone progress of the HEPS booster commissioning

请选择邀稿期刊:
摘要: The High Energy Photon Source (HEPS) is the first fourth-generation synchrotron light source building in China. Its injector consists of a Linac and a full energy booster. The booster captures the electron beam from the Linac and further increases its energy to the same as that required by the storage ring. The full-energy beam could be injected to the storage ring directly or after “high-energy accumulation”. On November 17, 2023, it was demonstrated that key parameters of the booster successfully reached corresponding target values. These milestone results were accomplished based on many contributions, including nearly a decade of physics design, years of development and installation of equipment, as well as months of beam commissioning. As measured at the extraction energy of 6 GeV, the averaged beam current and emittance reached 8.57 mA with 5 bunches and 30.37 nm.rad with a single-bunch charge of 5.58 nC, compared with the corresponding target values of 6.6 mA and 35 nm.rad, respectively. This paper presents the physics design, equipment development and installation, and commissioning process of the HEPS booster.

版本历史

[V2] 2023-12-28 20:05:30 ChinaXiv:202312.00132V2 下载全文
[V1] 2023-12-12 08:59:18 ChinaXiv:202312.00132v1 查看此版本 下载全文
点击下载全文
预览
同行评议状态
通过
许可声明
metrics指标
  •  点击量495
  •  下载量107
评论
分享