Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2023-11-11
Abstract: This report summaries the current status about the design of the structures rigidly connected with weak sky corridor, followed by studying in details the theoretical issues involved in the structural analysis associated with the estimation of torsion performance of the connected structures and cracking and stiffness deterioration of the connecting slabs, which are concerned by structural engineers.
In this report, taking deformation characteristics of the weak connecting slab as a key point, the basic principles of damage mechanics are applied to conduct a detailed and in-depth study on the stress redistribution between the concrete and steel, as well as between the concrete slab and supporting steel gird due to the damage evolution and deterioration of elastic modulus of the damaged concrete. Adopting the contrary thinking according to phenomenology, a suggestion of reducing the elastic stiffness including the flexural, shear and axial stiffness as the effective stiffness by the macroscopic stiffness reduction factor R is put forward, to reflect the microscopic concrete damage effects. Thus, a practical design method is proposed, by using the equivalent elastic time history analysis of a 3D model, in which each tower has its own rigid diaphragm and the connecting slab is flexible with reduced stiffness to effectively realize the above-mentioned stress redistribution.
Through a typical engineering example of the weak slab with reduced effective stiffness of the sky corridor connecting structures presented here, the report authors’ energy and ductility-based concept of the seismic design is elaborated in detail. The results of the equivalent elastic time history analysis of the example show that it is unreasonable to completely neglect the concrete contribution to the structural system combined with the reinforced concrete connecting slab and the steel truss, verify the effectiveness of the above practical design method which adopts the equivalent elastic time history analysis to assess the torsional performance of the connected structures and realize the redistribution of the internal forces due to the stiffness deterioration of the reinforced concrete connecting slab, which results in a substantial reduction in the steel quantity of the connecting truss.
In response to the phenomenon of assigning "zero stiffness" to connecting slab, which is widely adopted currently in design, the theoretical insights and recommendations in this report are inspirational and realistic meaningful to improve the design method as well as economic and technical indicators.
Peer Review Status:Awaiting Review
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:本研究以精细化管理理念为指导,结合国内外大型建设项目中BIM技术在设计阶段和施工阶段的应用, 从业主视角深入发掘除碰撞检查、综合布局优化、施工漫游及施工模拟等BIM应用点之外,基于BIM-5 D技术在投 资管控等关键节点的新型并联工作模式,旨在探索企业基于BIM技术进行流程再造以实现精细化建造在成本管理 等方面的创新应用,提高工作流程转化的效率,节约交易成本,为企业新建项目BIM技术的应用提供可参考的实施 方案。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:当前,限于各转换软件不能准确高效地将Revit模型与计算软件贯通,结构专业参与BIM设计时效率反 而会降低。本文基于火力发电厂主厂房等框排架结构,对设计流程和Revit软件的功能特点进行分析,以P}evit2016 与STAAD. Pro的贯通为例提出新的解决思路,并对Revit提出了完善建议()
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:BIM技术作为一项工程与信息技术相结合的产物,在促进工程全生命周期信息流动、提高工程建设质 量、减少工程建设运营过程综合成本中,起到了至关重要的支撑作用。当前BIM技术主要应用于建筑工程中,对水 利水电工程中的应用较少。未解决水利水电工程中的BIM应用问题,本项目在全球最大的沉砂池工程中采用设计 一施工周期内BIM持续应用的方法,通过周密的BIM组织和一系列的BIM技术应用,完成了土建异形结构、地形 地质BIM模型、钢筋BIM模型、BIM数字档案的一系列应用,从而为本项目的顺利实施打下了基拙。本文着重介绍 整个项目在组织和应用环境搭建、BIM应用及其效果,为以后的水电站BIM应用给出一个可行性方案。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:湖南航天医院门诊外科大楼平面形状为“楔型”,内部结构中部分梁柱节点存在有多根不同方向的梁交 汇于柱节点的情况,节点处钢筋密集复杂。在项目实施过程中,项目部运用BIM技术通过分层着色、合理确定钢筋 参数等方法实现了钢筋在三维模式下的空间位置精确定位、三维彩色显示、工序安排、钢筋原材定尺长度优化的目 的,提高了钢筋施工质量与原材料利用率。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:建筑信息模型(BIM ),以其强大的建筑数字化能力,已经在建筑生命周期的越来越多的领域和流程得到 应用。在建筑设计过程中,BIM模型需要经过多次的修改才能形成一份完善的项目设计方案,这些修改信息可以 为方案的优化设计提供借鉴,但是Revit不能对这些中间状态的信息提供详细地记录和有效地跟踪。为了实现对 模型修改过程的全程跟踪和提高BIM模型的修改效率,提出了一个基于事件监听机制的建筑信息模型的版本管理 方案,研究表明利用这个版本管理方案可以有效地实现对模型各种版本的修改信息的跟踪,方便了建筑信息模型 的管理;同时,版本管理方案采取合并操作信息的机制,对同一对象的冗余操作进行清除,缩短了模型从初始状态 到目标状态的执行时间,起到比较明显的加速作用。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:利用BIM技术和多网络互联的优点,结合总承包管理的需求,搭建面向所有参建单位开放的BIM综合信息管理平台;统一BIM信息标准,结合总承包管理机制,制定BIM信息提供与使用流程,优化项目公共资源调度、多专业协同管理、生产计划统筹协作等;利用提高信息化、网络化、智能化方式与手段,针对性应用于总承包管理工作中,以信息效率提升助力管理效率提升。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:研究目的:随着城市地铁建设日渐增多,地铁施工所面临的穿越各种既有运营线路的问题也随之增多。为了进一步了解盾构穿越既有运营线路的影响,本文根据某城市地铁施工实际情况,主要针对地铁盾构穿越既有铁路线时采取的各项控制措施,以及采取控制措施后各项变形情况进行分析。研究结论:地铁盾构穿越京广线股道群时,为减小对铁路运营的影响主要在于施工中采取的各种控制措施,本文通过本区间穿越期间对沉降进行分析,虽然在盾构穿越期间造成地表、轨枕、道尿沉降量较大,但通过各种控制措施合理施工,确保了穿越期间铁路运营安全。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:BIM作为信息化应用的第二次技术革命,是建筑业信息化和高效应用管理的必然趋势〔‘」,城市轨道交通涉及专业繁多,专业间协调沟通困难;本文基于城市轨道交通发展领域,利用BIM技术的空间可视化管理,从项目准备、分专业分阶段建模、模型整合、施工应用以及后期信息反馈收集等五个阶段出发,由三维指导、施工模拟、进度保证、成本管控、安全质量辅助管理等基本应用,再到绿色节能分析、辅助管线迁改技术以及应急疏散模拟等深化应用,充分将BIM技术应用于地铁施工中的整个周期,实现地铁项目施工信息化管理,打造智慧文明工地。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:随着近年来业主对桥梁的景观造型要求的提高,各种曲线造型的桥梁应运而生,这其中大部分是钢结构桥梁,具有空间曲线形状的结构用常规的二维图纸很难展现设计意图。设计本身虽只占用建筑全生命期的总成本的5%,但是却决定了其总成本的70 %,如果设计中采用可视化程度高、数据信息高度整合、协调性好的BIM技术川,可以完整展现设计院设计意图,提高钢板加工精度,改善施工组织,减少工程浪费,同时也为后期桥梁管养中BIM技术的实施提供准确可靠的模型载体。而目前复杂钢结构桥梁方向真正从设计开始的BIM技术应用尚属空白,解决后期BIM翻模不具备设计特性的问题,为真正做到从源头设计开始的全寿命周期BIM应用迈出关键的第一步。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:风荷载往往是超高层建筑结构安全性和舒适性的控制性荷载。本文通过大涡模拟技术并结合作者建议的一种新的湍流入口生成方法(NSP}FG方法),对四种不同锥度的楔形建筑模型进行了风效应的数值模拟对比研究,以比较不同锥度对结构风荷载和风振响应的影响,及检验本文数值模拟方法的适用性。数值模拟结果表明,虽然不同锥度的建筑模型平均风压和脉动风压分布规律相似,但在结构响应方面,结构横风向峰值基底弯矩响应随模型锥度增大显著减少,表明采用适当锥度的体形可以有效地减小结构横风向气动荷载。本文数值模拟结果和风洞试验结果整体规律相符,表明结合改进的入流湍流生成技术的大涡模拟具有一定的精度,可以给超高层建筑气动外形优化研究提供有价值的参考。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:宁波梅山春晓大桥是国内第一座双层纵移开启式全焊钢桥。本文介绍了通过自主开发专业BIM软件进行大桥三维正向设计的过程,通过平台统一管理多专业的设计数据信息,并集成多个应用软件对BIM设计成果进行了各项优化,其中无人机地形勘侧、虚拟现实、数字化扫描预拼装等新技术的成功运用为类似工程的BIM拓展打下了良好的基拙、)
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:分析了国内BIM协同设计的推广现状,给出了一般企业设计管理中经常存在的问题,针对这些问题进行 研究,给出了BIM协同设计建设方案,并对基拙软硬件架构建设进行了探讨,最后针对实施过程中经常遇到的问题 进行分析,并通过设计企业建设成果验证了推广方式的有效性。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:BIM(建筑信息模型)技术号称建筑业的第二次革命,自出现起即引起工程领域翻天覆地的变革。高校作为人才输出的重要基地,对技术研究和教育应有足够的前瞻性,而现有技术人才无法满足BIM发展与进一步推广的需求。本文从高校BIM人才培养现状入手,分析土建类BIM人才培养中存在问题,并针对人才培养能力需求提出具体措施,为BIM技术人才培养提供参考。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:为了改变施工企业内部档案传统纸质存储、手工操作的档案服务模式,开发了一种基于web的档案信息管理系统;本文介绍了施工企业档案业务流程、系统的功能设计与实现、关键技术等;应用结果表明:该系统实现了施工企业档案资料系统化、标准化和科学化管理,提升了档案管理水平和服务效率与质量。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:为推进我国建筑业节能的发展,改善大型公共建筑能耗量大的现状,对BIM技术在我国的应用现状进行综述。以某一公共建筑为研究对象,基于BIM技术的应用,运用建筑热环境模拟计算工具DUST软件对其分项能耗进行分析,得出其建筑热工性能、照明系统以及空调系统的节能统计结果,为能耗监侧系统的设计提供方向。基于统计结果的分析可知该公共建筑整体能耗量大,需进行实时监侧,因此从三方面设计了能耗监侧系统的基本功能和系统架构,旨在构建可靠、高效、共享度高的能耗数据库,建立能耗监侧、统计、公示平台,对推动BIM技术在建筑节能方向的应用具有一定研究作用和价值。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:随着建筑行业的发展,建筑信息化日益受到业界的关注。在建筑信息化过程中,BIM技术被当前建筑业各参与方视为热点讨论研究,国内外工程建设行业领域越来越多的项目都选择应用BIM技术,其所发挥的作用日益呈现。本文主要围绕BIM在项目建设全生命周期中的三个阶段,即设计阶段、施工阶段、运维阶段,所涉及的软件进行分析,为BIM工作者选择、采购BIM软件提供合理的比选依据。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:现代科技的进步以及市场竞争的日益激烈,促使业主、设计单位和施工单位发起了新一轮围绕着BIM和 3D打印技术展开的现代建筑业技术变革,以达到降低成本、提高质量、缩短工期等一系列内在增效的目的。随着 市政工程的规模、难度的加大,BIM应用在设计和施工中有了更大的施展舞台。乌鲁木齐国际公铁联运客运站项 目工程的工期短、工序安排紧促、需预加工的构件种类多且精度要求高。本企业BIM团队从项目中标后就开始介 入使用BIM技术,从设计、生产、施工全方位角度提供了一整套高效的工作管理模式。本文着重介绍项目前期启动 时建立的技术措施、工作流程与协调机制,在项目各阶段实施过程中逐步实现应用目标、解决施工难点并提高施工 精度的过程,以及最后提出对整个项目应用效果的总结分析和优化措施。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:随着BIM技术在国内的推广应用,大型公共建筑基本上采用了不同深度的BIM应用〔‘」。本文主要介绍 了长沙梅溪湖国际文化艺术中心幕墙工程在深化设计阶段、加工阶段、施工阶段和运维阶段的全生命周期BIM技 术应用。通过BIM技术应用,解决了幕墙深化设计难度大、加工精度要求高、施工安装管理难、运营维护难度大等 难点,实现了幕墙工程的智慧建造。
Subjects: Civil Engineering and Building Construction >> Civil Construction Structures submitted time 2017-11-30 Cooperative journals: 《土木建筑工程信息技术》
Abstract:乌东德水电站枢纽工程基于我院CATIA三维协同设计平台,嵌入设校审过程管理机制,融入BIM标准 体系,开展了数字化勘侧与地质、水工、桥隧、建筑、机电、金结、施工总体等多专业BIM设计建模。在工程勘侧设计 的不同阶段开展“方案比选与论证、参数化精细设计建模、有限元计算分析、多专业错漏碰检查、工程量自动统计、 三维配筋、二维出图、施工组织设计仿真、视觉传达”等多方位的专业性BIM应用工作,重点研发解决了地质三维模 型快速剖切成图、水工结构三维设计出图、复杂异形结构三维配筋出图等难题。